BASH WIND IPP
The Bash 500 MW Wind Farm is a greenfield Independent Power Project IPP that is developed by ACWA Power in the Republic of Uzbekistan.
ACWA Power and the JSC National Electrical Grid of Uzbekistan signed a 25-year Power Purchase Agreement (PPA) for the development/construction/operation of a 500 MW onshore wind power plant. JSC National Electric Grid of Uzbekistan acts as the sole off-taker.
The project will be located in the Bukhara region and will be developed as a ‘Build, Own, Operate, Transfer’ project. ACWA Power will take the lead in the construction, engineering, operation and maintenance the plant.
- • Anti-Retaliation Policy – English / Uzbek
- • Community Grievance Policy – English / Russian / Uzbek
- • Employee Grievence Policy – English / Russian
- • Human Resources Policy – English
- • HR Policy (Employment Handbook) – English / Uzbek / Russian
- • ESIA: Non-Technical Summary – English / Russian
- • ESIA: Main Text – English / Russian
- • ESIA: Framework for Environmental and Social Management – English / Russian
- • ESIA: Appendices Part A – English
- • ESIA: Appendices Part B – English
- • ESIA Consultation & Disclosure Report – English / Russian
- • Stakeholder Engagement Plan – English / Uzbek / Russian
- • Resettlement Action Plan – English / Russian
- • Summary of Material Updates to the ESIA Package – English / Russian
- • Responsible Sourcing Policy – English
- • Сode of Conduct – English
- • Non Retaliation police – English
- • GBVH Policy – English
- •Policy Against GBVH – English
KEY FACTS
-
LOCATIONBash, Bukhara Region, Uzbekistan
-
OFFTAKERJSC National Electric Grid of Uzbekistan (NEGU)
-
CAPACITY500 MW
-
TECHNOLOGYOnshore Wind
-
ACWA POWER SHARE100%
-
OFFTAKE CONTRACT25-year PPA BOO(T)
-
PROJECT COMPANYFE “ACWA Power Bash Wind” LLC
-
O&MNOMAC